Heatco ensures INNOVATION, QUALITY, and RELIABILITY in all of our products.

Expedite options currently available – call for more information.

Disclaimer:
– Lead times start after receipt of PO and sign-off drawings.
– Packaged dual/tandem units will add an additional week of lead time.
– Lead times are updated every day. Last Update: 9/7/2026.

Select a series below to begin:
Tubular Furnaces (HM-HD Series)Rack Systems (Racked HD Series)Drum and Tube Furnaces (HE/HF Series)Desiccant Dehumidification (HP)93% High Efficiency Furnaces (EM Series)90%+ High Efficiency Furnaces (EF Series)Direct-Fired (DF Series)

HM Heat Modules
(HMA, HMB, HMG, HMT)

Estimated Leadtime: 4 Weeks
Estimated Ship Date: 10/5/2026

HD Style CX
(No Vestibule / No Venting)

Estimated Leadtime: 4 Weeks
Estimated Ship Date: 10/5/2026

HD Style CK
Indoor Top or Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style CS
Indoor Sep. Combustion

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style CN
Outdoor Top Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style CW
Outdoor Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style K
Indoor Top/Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style S
Indoor Sep. Combustion

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style N
Outdoor Top Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HD Style W
Outdoor Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

Filter by unit/description (ex. “HDB-HHX, Vestibule”) or leadtime (ex. “4 weeks”):

HDB-HHX
Horizontal Rack Assembly

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHX
Vertical Rack Assembly

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHX
Vertical Rack Assembly

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHX
Horiz. Rack w/ Outdoor Venting

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHX
Vertical Rack w/ Outdoor Venting

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHX
Vertical Rack w/ Outdoor Venting

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHX
Horiz. Rack w/ Ind. Venting (Outside Mount)

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHX
Vert. Rack w/ Ind. Venting (Outside Mount)

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHX
Vert. Rack w/ Ind. Venting (Outside Mount)

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHX
Horiz. Rack w/ Ind. Venting (Inside Mount)

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHX
Vert. Rack w/ Ind. Venting (Inside Mount)

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHX
Vert. Rack w/ Ind. Venting (Inside Mount)

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHP
Outdoor Vestibule

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHP
Outdoor Vestibule

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHP
Outdoor Vestibule

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHP
Indoor Vestibule

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHP
Indoor Vestibule

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHP
Indoor Vestibule

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHP
Indoor Cabinet

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHP
Indoor Cabinet

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHP
Indoor Cabinet

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-HHP
Outdoor Cabinet

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDB-VHP
Outdoor Cabinet

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HDA-VHP
Outdoor Cabinet

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HE-XX
No Cabinet, No Vestibule

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HE-VE
Indoor/Outdoor Vestibule

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HE-SE
Separated Combustion Vestibule

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HF-XX
No Cabinet, No Vestibule

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HF-VF
Indoor/Outdoor Vestibule

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HF-SF
Sep. Combustion Vestibule

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HF-FC
Indoor/Outdoor Cabinet

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HF-SC
Sep. Combustion Cabinet

Genesis Burner
Estimated Leadtime: 9 Weeks
Estimated Ship Date: 11/9/2026
Powerflame Burner
Estimated Leadtime: 10 Weeks
Estimated Ship Date: 11/16/2026

HP Style CK
Indoor Top or Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HP Style CN
Outdoor Top Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HP Style CW
Outdoor Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HP Style K
Indoor Top/Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HP Style N
Outdoor Top Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

HP Style W
Outdoor Front Exhaust

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

EMA
OEM Insert

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

EMG
OEM Insert

Estimated Leadtime: 6 Weeks
Estimated Ship Date: 10/19/2026

EM Style CK
Indoor Top or Front Exhaust

Estimated Leadtime: 7 Weeks
Estimated Ship Date: 10/26/2026

EM Style CS
Indoor Sep. Combustion

Estimated Leadtime: 7 Weeks
Estimated Ship Date: 10/26/2026

EM Style CW
Outdoor Front Exhaust

Estimated Leadtime: 7 Weeks
Estimated Ship Date: 10/26/2026

EM Style K
Indoor Top/Front Exhaust

Estimated Leadtime: 7 Weeks
Estimated Ship Date: 10/26/2026

EM Style S
Indoor Sep. Combustion

Estimated Leadtime: 7 Weeks
Estimated Ship Date: 10/26/2026

EM Style W
Outdoor Front Exhaust

Estimated Leadtime: 7 Weeks
Estimated Ship Date: 10/26/2026

EF
OEM Insert

Estimated Leadtime: 13 Weeks
Estimated Ship Date: 12/9/2026

EF-VF
Indoor/Outdoor Vestibule

Estimated Leadtime: 13 Weeks
Estimated Ship Date: 12/9/2026

EF-SF
Separated Combustion Vestibule

Estimated Leadtime: 13 Weeks
Estimated Ship Date: 12/9/2026

EF-FC
Indoor/Outdoor Cabinet

Estimated Leadtime: 13 Weeks
Estimated Ship Date: 12/9/2026

EF-SC
Separated Combustion Cabinet

Estimated Leadtime: 13 Weeks
Estimated Ship Date: 12/9/2026

DF

Estimated Leadtime: 8 Weeks
Estimated Ship Date: 11/2/2026